Product design from the first card model to the factory sample
Juno Hale designs small appliances, lighting and outdoor gear for brands that make things (sample). Every project is a row of models like this one, each answering one question before the next is made.
Pour kettle for Brightwell Home (sample): seven models in 22 weeks, card mock-up to factory sample. All models drawn to the same scale, ruler in centimetres.
Selected work
Three products from the last two years, each from the first sketch to the first parts off the production tools.
The fill in every line-up is the material. Each kind of model costs a different amount of time and answers a different question, so you only pay for the ones your product needs.
Card mock-up
Is it the right size? Card, tape and a printed label, made in an afternoon. Cheap enough to make five and throw four away.
Half a day
Foam model
How does it feel in the hand and look in the room? Blue foam is cut, sanded and held, and changed with a knife the same day.
1 to 3 days
3D printed model
Do the details work? Lids, clips, joints and buttons are printed to size and tried, part by part.
2 to 5 days
Works-like rig
Does it work? An ugly box with the real heater, LEDs or motor inside, tested for heat, battery life and safety.
1 to 3 weeks
Looks-like model
Is this the product? Printed, filled, sanded and painted in the chosen colour and finish, for photos and buyers.
1 to 2 weeks
Factory sample
Did the factory make what we drew? Parts from the production tools, measured against the drawings before sign-off.
From the factory
Services
Book one stage or the whole project. Prices are fixed per stage once the brief is agreed.
Concept design
Research, sketches, card and foam models and three clear directions to choose from, with renders of the chosen one.
Seven steps from the first call to the first factory sample. A whole product takes about 22 weeks; you can stop after any step and keep everything made so far.