TopsoilMade groundClaySand and gravelMudstone▽Water struck▼Water level after 20 minutes
Depths in metres below ground level. The core is drawn to scale; the rows say what the drill found and what it means for the new homes planned on the site (sample log).
Monitoring visits
Wells are visited on a schedule the council agrees, often monthly for three to six months.
Levels
Depth to water in each well, to see which way it flows
Gas
Methane, carbon dioxide and oxygen at each well head
Samples
Purged and sampled with low-flow pumps, sent to the lab the same day
Report
A short letter after each round and a full report at the end
Send us the site address
We check the old maps and the planning record before we reply, so the quote fits the site. Most quotes go out within two working days (sample).