Bat emergence surveys booked into late June (sample)

Remediation and verification

The plan to deal with what was found, agreed with the council, and the proof that it was done.

Ways to deal with what was found

The strategy picks the simplest option that makes the site safe for its new use (sample options).

Dig out and replace

Contaminated soil removed to a permitted site and replaced with tested clean soil

Clean cover

600 mm of tested clean soil over the made ground in gardens and play areas, with a marker layer

Treat on site

Hydrocarbons broken down in a treatment bed on site, then reused under roads

Gas protection

A membrane and venting under the new buildings where ground gas was found

The verification report

The last step: it shows the council that the strategy was carried out, so the planning condition can be discharged.

Send us the site address

We check the old maps and the planning record before we reply, so the quote fits the site. Most quotes go out within two working days (sample).