Back to all demos LT Envico demo One-page version Get this theme on ltheme.com

Bat emergence surveys booked into late June (sample)

Site investigation

From the old maps to the sign-off report, for land with a history.

Borehole BH01, former bus depot, Mill Lane (sample)

Drilled on 14 May to 8.00 m with a cable percussion rig. Ground level 42.10 m. Logged by R. Okoye (sample).

Depth (m)

Layer as logged

Samples and tests

What it means for the site

0.00–0.30 m

Topsoil

Dark brown sandy topsoil with grass roots.

S1 at 0.10 m: metals and an asbestos screen

Fit to reuse in the new gardens if the lab results stay below the screening levels (sample).

0.30–1.80 m

Made ground

Grey-black ash, brick, clinker and broken concrete. Diesel odour from 0.90 m.

S2 at 0.90 m: hydrocarbons, PAHs and metals. Gas reading 85 ppm

Hydrocarbons above the level for homes with gardens. Dig out or cover with clean soil before building (sample).

1.80–4.50 m

Clay

Firm brown silty clay, mottled grey. Water struck at 3.20 m , rose to 2.60 m in 20 minutes.

S3 at 2.50 m: no odour, kept for testing

A tight layer that slows anything in the made ground on its way down to the gravel.

4.50–7.20 m

Sand and gravel

Wet orange-brown sand with flint gravel.

Monitoring well screened from 4.50 to 7.00 m; water sampled every month

The groundwater that feeds the brook downstream. We check that it stays clean (sample).

7.20–8.00 m

Mudstone

Weathered grey mudstone. End of hole at 8.00 m.

None

Bedrock, nothing to report. The hole above the well was sealed with bentonite.

Topsoil Made ground Clay Sand and gravel Mudstone ▽Water struck ▼Water level after 20 minutes

Depths in metres below ground level. The core is drawn to scale; the rows say what the drill found and what it means for the new homes planned on the site (sample log).

Three parts, in order

Most sites need the first; fewer need the second; only some need the third.

What the site was used for and what that could have left in the ground.

Holes where the desk study points, samples and the risk assessment.

The plan to deal with what was found, and the proof that it was done.

Send us the site address

We check the old maps and the planning record before we reply, so the quote fits the site. Most quotes go out within two working days (sample).

Demo photos from Pexels by IslandHopper X, Павел Хлыстунов, Igor Pericles, Vladimir Srajber, Mikhail Nilov, Jahra Tasfia Reza, Mathias Reding, Nuno Magalhães, Alena Darmel, RDNE Stock project, Grégory Costa, Nalam Team. The theme download contains placeholder pictures, not these photos.