Stages and payments

What happens at each of the eight stages, the check that ends it and what you pay.

Eight stages, one fixed price

Each build stage ends with a check. You pay the progress payment for a stage only after it passes and you have walked it with your supervisor.

1

Stage 1, site visit: front elevation of the house at this stage

Site visit

Week 1

We walk the block with you, look at the slope, the soil and the planning rules, and peg out where the house could sit.

Ends with

Soil test and survey booked

You pay

Free

2

Stage 2, design: front elevation of the house at this stage

Design

Weeks 2 to 9

Your designer draws the house with you: plans, elevations and a 3D model, with a first price at the end.

Ends with

You sign off the plans

You pay

Design fee

3

Stage 3, permit and fixed price: front elevation of the house at this stage

Permit and fixed price

Weeks 10 to 17

Construction drawings, the engineer’s details and the building permit, then a fixed-price contract to sign.

Ends with

Building permit issued

You pay

5% deposit

4

Stage 4, base: front elevation of the house at this stage

Base

Weeks 18 to 21

Site cut, footings and the concrete slab. The engineer checks the steel before every pour.

Ends with

Slab inspection

You pay

15%

5

Stage 5, frame: front elevation of the house at this stage

Frame

Weeks 22 to 26

Wall frames and roof trusses go up. Nothing is covered until the frame passes inspection.

Ends with

Frame inspection

You pay

20%

6

Stage 6, lock-up: front elevation of the house at this stage

Lock-up

Weeks 27 to 33

Roof, outside walls, windows and the front door go on: the house can be locked.

Ends with

Waterproofing check

You pay

25%

7

Stage 7, fixing: front elevation of the house at this stage

Fixing

Weeks 34 to 42

Insulation, plaster, the kitchen and bathrooms, doors, wiring and plumbing, then paint.

Ends with

Pre-handover walk-through with you

You pay

20%

8

Stage 8, handover: front elevation of the house at this stage

Handover

Week 44

The final inspection with you, the occupancy certificate and the keys. We come back after three and twelve months.

Ends with

Occupancy certificate

You pay

15%

Weeks and payments (sample) for a single-storey home of 200 m².

Questions about paying

Yes. Up to a 1-in-10 slope the site cut is in the fixed price. Steeper than that we design a split level or a suspended floor, and price retaining walls after the soil test.

Nothing for the site visit, a design fee for stage 2, a 5% deposit when you sign the fixed-price contract, then a progress payment at the end of each build stage: 15% base, 20% frame, 25% lock-up, 20% fixing and 15% at handover (sample).

Small changes are possible until the frame stage, as a written variation with its price before any work is done. After lock-up, changes to walls, windows and plumbing get expensive.

About ten months from the first site visit to the keys for a single-storey home: eight weeks of design, eight for the permit and the contract, then 36 to 44 weeks on site (sample).

Yes, with your site supervisor. You get a walk-through at the end of every build stage, and you can book a visit any other week. Closed shoes, and children stay outside the fence.

Send us the address of your block

Tell us where the land is and what you would like to build. A designer calls you within two working days and books a free site visit: an hour on the block with the person who would draw your home.