Back to all demos LT Architecture demo One-page version Get this theme on ltheme.com

Free site visits, Monday to Saturday (sample)

Site diary

Fixing: the longest stage, and the one you see most

Open-plan room at fixing stage with plastered walls, a radiator and tools on the floor

Fixing starts when the house is locked up and dry (sample diary). Insulation and plaster come first, then the kitchen, the bathrooms and the internal doors.

The electrician and the plumber come back for the fit-off: switches, lights, taps and toilets. Painters work room by room behind them.

At the end of fixing you walk the house with your supervisor and mark anything to touch up. We fix those before the final inspection and handover.

Demo photos from Pexels by Curtis Adams, Pixabay, Brett Jordan, Angie Reyes, David Brown, Ron Lach, Peter Vang, Rodolfo QuirĂ³s, D Goug. The theme download contains placeholder pictures, not these photos.