An old weatherboard house with failing stumps comes down, and a two-storey home goes up on the same block. The plans are signed off and the permit application is in.
Disconnecting gas, power and water before demolition
A demolition permit, asbestos check and two weeks to clear the block
Somewhere to live for about ten months
44 to 54 weeks from demolition to the keys (sample)