Back to all demos LT Resume demo One-page version Get this theme on ltheme.com

Available from 1 December (sample). Springfield, on site or hybrid

Experience

Three employers and eleven years, newest first. Every result carries the letter of the criterion it proves, so you can check it against your own specification.

Roles

Open a role for the team size, reporting line, budget and everything I changed there.

2021 to now

Operations manager

Northgate Distribution (sample). Three sites around Springfield

  • Run three sites and 140 staff on two shifts through nine team leaders (sample). A
  • Own a $6.2m site budget; cost per order down 18% in two years (sample). B
  • Moved all three sites to a new warehouse system over one weekend; the dock opened on Monday at 06:00 (sample). D
  • Ran a pick-to-light pilot on two aisles: picks per hour up 22% (sample). E

2015 to 2021

Night shift manager

Harbour Freight Services (sample). Cross-dock, Port Road

  • Led a night shift of 60 on a 24-hour cross-dock (sample). A
  • 410 days without a lost-time injury, from three a year before I started (sample). C
  • Rebuilt the night rota with the team: agency hours down by a third (sample). AB

2012 to 2015

Team leader, goods in

Riverside Foods (sample). Chilled depot, Mill Road

  • Ran chilled goods in: about 120 deliveries a day (sample). A
  • Wrote the cold-chain checks still used on the dock (sample). C
  • Trained 30 new starters on safe pallet handling (sample). C

Skills, with the evidence

The same three marks as the sheet: done at this scale, done at a smaller scale, learning now. No percentages.

People

Hiring, rotas, coaching team leaders, return-to-work talks

140 staff and 9 team leaders at Northgate (sample)

Done

Safety

Risk assessments, incident reviews, audits, near-miss reporting

410 days without a lost-time injury (sample)

Done

Systems

Warehouse system set-up and migration, handheld scanning, slotting

Three sites moved in one weekend (sample)

Done

Money

Site budgets, cost per order, agency spend, capital requests

$6.2m budget, cost per order down 18% (sample)

Done

Automation

Pick-to-light, conveyor sortation, working with integrators

Two-aisle pilot, not yet a whole site (sample)

Smaller scale

ERP

Stock and finance modules, data clean-up before a move

Course and test system, finishing in March (sample)

Learning now

Done at this scaleDone, smaller scaleLearning now

Tools and systems

Warehouse systems

Set-up, slotting rules, user training, cut-over planning

Scanning

Handheld and ring scanners, label printing, cycle counts

Planning

Hour-by-hour volume boards, rota software, labour models in spreadsheets

Reporting

Daily site dashboards, cost per order, weekly safety reports

A long, empty distribution hall with painted walkway lines and racking on the right

Hiring for a role like this?

Send me the person specification. I answer every criterion with evidence, the same way as the sheet at the top of this site, within two working days.

Demo photos from Pexels by Daniel Andraski, Freek Wolsink, Tiger Lily, Yan Krukau, Julia M Cameron, veerasak Piyawatanakul, Ayrat, Kampus Production, Pixabay, Stanislav Kondratiev. The theme download contains placeholder pictures, not these photos.